@ -179,17 +179,21 @@ I propose to divide the project into four milestones/deliverables to produce a s
#### **Milestone #1: Create a Bare-bone `package: mem0_dart`.**
This milestone will lay the foundation of `mem0_dart` library, porting core configuration classes and setting up testing frameworks. This milestone will be the first deliverable but it will take the least amount of time and effort to build.
This milestone will lay the foundation of `mem0_dart` library, porting core configuration classes and setting up testing frameworks.
This milestone will be the first deliverable but it will take the least amount of time and effort to build.
#### **Milestone #2: Vector Store Integrations**
This milestone will integrate and implement multiple Vecotor DB providers available in Dart.
Implementation efforts will concentrate more on the core methods (insert, search, delete, and get).
#### **Milestone #3: LLM and Embedding Model Integration with Basic Functionality**
This Milestone is divided into two parts. The first path will aim at adding integrations for multiple Embedding models.
The second part will add integrations for LLMs and the core memory operations for addition, retrieval, and updating will be ported and tested.
The second part will add integrations for LLMs and additionally the core memory operations for addition, retrieval, and updating will be ported and tested.
#### **Milestone #4: Add Graph Memory Capabilty**
@ -235,7 +239,8 @@ their final mentor evaluation (standard coding period)
Work on M#2 begins in the latter half of the week.
* **Week 2 (June 9 - June 15)**
Start of M#2 integration for the first two chosen vector database capable of basic vector operations(insert, search, delete, and get) are done, along with unit tests.
Integration of first two chosen vector database and implementation of basic vector operations(insert, search, delete, and get) are done, along with unit tests.
* **Week 3 (June 16 - June 22)**
Building upon the previous week, the integration of the other remaining vector databases will be done.