Files
Joel Brobecker 61baf725ec update copyright year range in GDB files
This applies the second part of GDB's End of Year Procedure, which
updates the copyright year range in all of GDB's files.

gdb/ChangeLog:

        Update copyright year range in all GDB files.
2017-01-01 10:52:34 +04:00

69 lines
2.1 KiB
Ada

-- Copyright 2009-2017 Free Software Foundation, Inc.
--
-- This program is free software; you can redistribute it and/or modify
-- it under the terms of the GNU General Public License as published by
-- the Free Software Foundation; either version 3 of the License, or
-- (at your option) any later version.
--
-- This program is distributed in the hope that it will be useful,
-- but WITHOUT ANY WARRANTY; without even the implied warranty of
-- MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. See the
-- GNU General Public License for more details.
--
-- You should have received a copy of the GNU General Public License
-- along with this program. If not, see <http://www.gnu.org/licenses/>.
procedure Foo is
task type Caller is
entry Initialize;
entry Call_Break_Me;
entry Finalize;
end Caller;
type Caller_Ptr is access Caller;
procedure Break_Me is
begin
null;
end Break_Me;
task body Caller is
begin
accept Initialize do
null;
end Initialize;
accept Call_Break_Me do
Break_Me;
end Call_Break_Me;
accept Finalize do
null;
end Finalize;
end Caller;
Task_List : array (1 .. 3) of Caller_Ptr;
begin
-- Start all our tasks, and call the "Initialize" entry to make
-- sure all of them have now been started. We call that entry
-- immediately after having created the task in order to make sure
-- that we wait for that task to be created before we try to create
-- another one. That way, we know that the order in our Task_List
-- corresponds to the order in the GNAT runtime.
for J in Task_List'Range loop
Task_List (J) := new Caller;
Task_List (J).Initialize;
end loop;
-- Next, call their Call_Break_Me entry of each task, using the same
-- order as the order used to create them.
for J in Task_List'Range loop -- STOP_HERE
Task_List (J).Call_Break_Me;
end loop;
-- And finally, let all the tasks die...
for J in Task_List'Range loop
Task_List (J).Finalize;
end loop;
end Foo;